inner-banner

Foam old

After approximately 20 years this foam bitumen stabilised (FBS) pavement in Hoppers Crossing has been tested by Site Geotechnical and determined as requiring minimal asphalt overlay treatment to withstand another 20 years. forensicengineering treatments such as these are being under-utilised in Victoria. With appropriate investigation and innovative pavement design Victorian councils and Department of Transport (DoT) can have lon-lasting pavements, minimise maintenance, re-use existing materials while meeting sustainability, cost and design objectives. sustainability design maintenance

case-studies-5
gettouch-bg
Get In Touch

    Thank you for getting back to us so quickly, we really appreciate it. We are really excited to utilise option 5 as the location of our AGs are now shallower within our pavement and hopefully we will encounter no/minimal clashes with existing shallow services. Thank you again and we look forward to working with the team in the future.
    Adrian
    Case Studies
    Project Request Form