After approximately 20 years this foam bitumen stabilised (FBS) pavement in Hoppers Crossing has been tested by Site Geotechnical and determined as requiring minimal asphalt overlay treatment to withstand another 20 years. forensicengineering treatments such as these are being under-utilised in Victoria. With appropriate investigation and innovative pavement design Victorian councils and Department of Transport (DoT) can have lon-lasting pavements, minimise maintenance, re-use existing materials while meeting sustainability, cost and design objectives. sustainability design maintenance
Looking for resilient subgrade preparation on soft soils
After approximately 20 years this foam bitumen stabilised (FBS) pavement in Hoppers Crossing
Foam Bitumen Stabilisation (FBS) works being conducted
Macadam is a type of road construction.
Site Geotechnical - Mini Rig Great little job
We were in the Melton area today and came across a bridge and road upgrade
Sometimes we just can’t understand the Rhyme
Soil #Mattressing is deformation caused by high water pressures
Site Geotechnical undertook asphalt coring within one of Melbournes busiest freeways to obtain asphalt samples.
Innovation, collaboration and the extraordinary efforts of the project team and key stakeholders
Safely investigate during the day
Detailed Geotechnical investigation followed by considered structural design